The rear steps were poured the same day as the driveway. The edge of the patio will sit on top of the concrete pad at the bottom of the steps.
5 July 2002
Copyright © 2001-2005 by Bradley D. Mohr and Kathleen A. Whalen. All Rights Reserved.