
When they first poured the top step, it was just a bit lower than the porch. Exactly enough height difference to be a trip hazard. The concrete crew came back and ripped it out, soon to be replaced by a flush step.
29 July 2002
Copyright © 2001-2005 by Bradley D. Mohr and Kathleen A. Whalen. All Rights Reserved.